IDEAL INDUSTRIES 45-930 User Manual

Browse online or download User Manual for Unknown IDEAL INDUSTRIES 45-930. IDEAL INDUSTRIES 45-930 User's Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Cable Stripping System

Shielded Twisted Pair(STP) Cable Stripping SystemFor 115V or 230V Operation Manual#45-930#45-935

Page 2 - Introduction

10STP Operation continuedSet Mode1 — STRIP LENGTH INCREMENT This allows programming the strip length in increments by using the arrow keys to incr

Page 3 - Unpacking

STP Operation continuedBatchingStoring a Batch• Press BATCH• Press PROGRAM• Enter the 3-digit security code• Enter in the batch number for storage• Pr

Page 4 - STP Service Setup Continued

12Name Part No. Quantity Per UnitBlade Set K-7763 1Front Grip Pad LA2408 2Rear Grip Pad LA2414 6STP Service continued3 — GRIP BACK SENSOR (senses if

Page 5 - STP Operation

STP Operation continuedGripper Pad ReplacementThe STP has two sets of grippers. The front grippers hold the wire while the rear grippers pull off the

Page 6

Rear Gripper Pad Replacement 1. Disconnect power2. Disconnect air3. Open caseCaution blades may be hot.STP Service continuedA NEEDLE-NOSE PLIERMAY BE

Page 7

STP Service continuedBlade Replacement1. Electronically set strip length to 6". This moves the stop bar all the way back allowing more room to r

Page 8

9. Remove the four #4-40socket head screwspositioning blades. 10. Pull elements guidinglead wire throughholes.11. Reverse the process by feeding th

Page 9

17CPU Module ReplacementThe CPU Module (Central Processing Unit) and the Power Module are not fieldrepairable, they must be returned to IDEAL for serv

Page 10 - Set Mode

18Always disconnect power and air when servicing the unit. Please read theOperation Manual thoroughly before attempting to operate the STP.SYMPTOM REC

Page 11 - Batching

STP Machine Assembly*Refer to Sub Assemblies with their own parts lists on pages 16 and 17.19Heat Speed PressurePragm.HighBatchEnter•CountClearStripLe

Page 12 - Recommended Replacement Parts

2Table of ContentsIntroduction... 2Caution and Safety Instructions...

Page 13 - Front Gripper Pad Replacement

20Item Qty Name Part No.1 1 Assy, Interface Board K-74682 1 Assy, Pressure Regulator K-77493 1 Air Solenoid 392.0024 1 Assy, Power Supply IA32735 1 Ai

Page 14

21571213910826411Item Qty Name Part No.1 2 Rod Support Bar K-75542 1 Cylinder Bar K-75553 1 Stop Bar K-75564 1 Motor Driver Rod K-75605 1 Follower Rod

Page 15

+5V LOGICPOWERSUPPLY- +DISPLAYKEYBOARDTRANSPORT MOTORTHERMAL HEADMOTORPRESSUREREGULATORASSEMBLYAIRINPUTAIR OUTTO REARGRIPSOLENOIDAIR BLASTSOLENOIDTRAN

Page 16

Warranty limited solely to repair or replacement; no warranty of merchantability, fitness for a particular purpose or consequential damages.1000 Park

Page 17

Caution and Safety InstructionsPlease read, understand and follow the warnings and instructions in this manual. Failure to do so can result in serious

Page 18 - Tips and Trouble Shooting

4STP Service Setup ContinuedElectrical Connection RequirementsVoltage SelectionThe STP operates on either 115V/230V AC; 45-930, 115V AC 4A 60 Hz ; 45-

Page 19

5STP Operating Principles and Terms (continued)SPEED: Thermal Head RotationSPEED refers to the rate of rotation by the Thermal Head of the STP. This i

Page 20 - 1 1 1 2 2 1

6STP Operation continuedHeat AdjustmentHeat can be adjusted by pressing [0] through [9] producing corresponding heat values of 0% through 90%. Pressin

Page 21

STP Operation continuedStrip Length Adjustment, by Discrete ValueMETRIC LENGTH MODE (31 mm to 152 mm)• Press STRIP LENGTH.• The strip length display w

Page 22 - 1234 56789

8STP Operation continuedTWO STAGE CYCLEThe TWO STAGE CYCLE is intended to break the STP’s stripping cycle into two separate stages; stage one is for c

Page 23 - ©2002 IDEAL INDUSTRIES, INC

STP Operation continuedSlug Removal SINGLE CYCLEThe STP can be used to remove the slug without applying heat to the blades, if the insulation has alre

Comments to this Manuals

No comments